LASG begs motorists for cooperation as drainage work begins on Otedola bridge

The Lagos State Government has urged motorists plying Otedola under-bridge to cooperate with Traffic Officials as traffic under the bridge will be narrowed to a single lane for four days starting from Wednesday  (today) 15th March 2017 when the excavation works of the on-going construction of Omole Jubilee Estate/Agiliti drainage channel commences.

The excavation works is to give room for the construction of culverts to de-flood Omole, Magodo, Shangisha, Agiliti, Mile 12, Otedola under bridge and part of Alausa.

Motorists are therefore enjoined to drive carefully and maintain a single lane, starting from the commencement date of the excavation works.

Lagosians are assured of the determination of the Lagos State Government to ensure a flood-free Lagos.

Leave a Reply

Your email address will not be published. Required fields are marked *