Posts in tag

Road Rehabilitations in Lagos


ENGR. OYESANYA CONTINUES THE ROAD PROJECT AT ABIODUN OLUSOLA STREET, MAGODO GRA PHASE 11, WARD B. LAYING OF ASPHALT IS ONGOING! OYESANYA IS WORKING, IKOSI-ISHERI LCDA IS MOVING FORWARD.

Posted by: Abosede Ikotun 03-02-2016 As part of the lagos state ongoing rehabilitation of  bad roads across the state, Brown Street,one of the popular Street in Oshodi  is going through face lift as the re-construction is ongoing and the images below can attest to it. big up to Oga Ambode ( Itesiwaju Ilu Eko Lojewalogun)